Main Entrance

Main Entrance

The scaffold is up and the masons are preparing to commence the stone work at the main entrance.

Advertisements

Ceiling Detail

Ceiling Detail

Many mechanical lines and equipment must be coordinated in order to maintain maximum ceiling height in the lower level. Electrical conduit, insulated HVAC runs, copper water supply, orange pvc fire sprinkler lines. Good job by our team of contractors.